AI Computing
Data Center
A vertically integrated ecosystem in Juazeiro, Bahia, co-locating Tier III ‘Powered Shell’ infrastructure with utility-scale solar arrays.
Location
Juazeiro, Bahia
IT Load Capacity
Mission-Critical Availability
Solar Generation
Dedicated Captive Array
Target PUE
Industry-Leading Efficiency
Grid Status
Baseload optimization through integrated BESS.
The Infrastructure
Blueprint
The Juazeiro facility represents a new paradigm in data center engineering. By eliminating the distance between generation and consumption, we provide high-density AI/Cloud workloads with direct, carbon-free energy.
Tier III Certification
Dual-powered cooling and networking paths.
Integrated BESS
Lithium-ion energy storage for peak shaving and stability.
Hyperscale Ready
Powered Shell delivery for rapid tenant deployment.
Technical Dossier
Performance Specs
Revision: Q3 2024
Status: Operational Development
Primary Energy Source
135.2 MWp
Installed Solar Capacity
Bi-Facial
Module Technology
Real-time PUE
Thermal Management
Closed-loop chilled water with air-side economization.
Physical Security
- 5-Layer Security Perimeter
- 24/7 On-Site SOC
- Biometric Access Control
Network Infrastructure
Carrier-Neutral Hub with Sub-10ms Latency to Regional IXPs
Secure Your High-Density
Cloud Footprint
Ready for deployment. Contact our infrastructure group to discuss powered-shell configurations and specialized AI racking solutions.
ENERGENDE
Powering the next generation of global computing through sovereign energy infrastructure.
Group Entities
Global HQ
Avenida Paulista, 1000
São Paulo, Brazil
[email protected]
© 2024 ENERGENDE INFRASTRUCTURE GROUP. ALL RIGHTS RESERVED.